Additional Load Approval is the formal authorization required when a customer wants to increase their existing electrical load capacity beyond their current sanctioned limit. This ensures the infrastructure can safely handle the extra demand.
You’re installing new high-power equipment (e.g., ACs, industrial machinery).
Expanding your property (residential/commercial).
Upgrading from a single-phase to a three-phase connection.
Your current load exceeds the sanctioned limit.
The process varies by utility provider but generally includes:
Submitting an application (online/offline).
Providing property documents, load details, and wiring diagrams.
Paying applicable fees.
Scheduling an inspection.