Dewa Approvals

Streamline Your Dubai Project with DEWA Approvals

DEWA offers various types of approvals depending on the nature of the project, ensuring compliance with safety and regulatory standards. For new residential, commercial, or industrial properties, New Electricity & Water Connection Approvals are mandatory. Construction sites and temporary events require Temporary Power Supply Approvals to secure short-term electricity access. Under the Shams Dubai Initiative, Solar PV System Approvals are necessary for installing rooftop solar panels and connecting them to DEWA’s grid. Additionally, Electrical Load Approvals verify that load calculations meet DEWA’s technical requirements, while Water & Sewerage Approvals cover new connections, modifications, and drainage systems. Before any excavation near DEWA infrastructure, contractors must obtain a No Objection Certificate (NOC) to avoid penalties and ensure safety. Each approval type follows specific guidelines to maintain efficiency and regulatory compliance.

DEWA Approval Process

Obtaining DEWA approvals is a structured process designed to ensure all electricity, water, and renewable energy installations in Dubai meet strict safety and regulatory standards. The process begins with submitting essential documents, including the application form, site plans, load calculations, and the contractor’s DEWA registration. DEWA reviews the application and may conduct on-site inspections to verify compliance before issuing the No Objection Certificate (NOC) and proceeding with the connection. Property owners must provide proof of ownership, identification, approved architectural drawings, and a load calculation sheet for electrical connections.

Only contractors registered with DEWA are authorized to carry out electrical and water installations, as they must adhere to DEWA’s technical guidelines. The costs for approvals vary depending on the type of connection—residential, commercial, or industrial—and include a refundable security deposit. For solar panel installations under the Shams Dubai program, fees are determined by the system’s capacity.

Applications can be conveniently submitted through DEWA’s official website, mobile app, or in-person at Customer Happiness Centers. Failure to comply with DEWA regulations, such as unauthorized connections or meter tampering, can result in penalties, service disconnection, or legal action. By following the proper procedures, customers can ensure a smooth and efficient approval process for their utility needs.

Download

Documentof recent business

Business Consulting

Documentof recent business

Business Consulting
Need Help? We Are Here To Help You

PROJECTS

Discover FAQ From Our Expert Support

DEWA approval is an official authorization from Dubai Electricity and Water Authority for electricity, water, or solar system installations. It ensures compliance with safety standards and legal regulations in Dubai. Without it, utility connections cannot be activated.

Typically, 5–10 working days for standard applications. Complex projects (e.g., large solar installations or industrial connections) may take longer due to additional inspections.

Use the DEWA Smart App or online portal (www.dewa.gov.ae) with your application reference number.